Integrated Supervisory Control System of Rail Transit
Publish Date:2021-04-21Scheme Background
ISCS (Integrated Supervisory Control System)
The Integrated Supervisory Control System (ISCS) integrates ÷the monitoring layers of several similar automation systems into a unified monitoring system ♥platform, which realizes the information integration and sharing, integrated monitoring and opera∏tion of all integrated and interconnected systems, and prov∏ides a platform for users to realize information exchange and resource sharing.
Rail Transit ISCS generally consists of the following sub-systems:
► Building Aut<omation System (BAS) ► Fire Alarm Systemγ (FAS)► Power Supervisory Control And Data Acquisition ≤(PSCADA) ► Access Control System (ACS)► Platform Screen Door (PSD)
ISCS Network Requirements
● ISCS network has two diff÷erent networking methods: if optical transmission equipmen©t is used as backbone network or Ethernet switch is us✔ed for standalone networking, ISCS is usually interconnected with other systems.
● ISCS usually requires ring network with good reliability, r₽eal-time capability and convergence.
●Considering the broadca♦st domain control and security, it is recommended to use 3-βlayer networking mode for ISCS network.
Scheme Topology ISCS 1
ISCS of Beijing Subway Fangshan Line. Integrator: N®ARI.
OTN transmission backbone network and 2-layer network are used, and all ISCS♥ terminals are located in the same network segment.
Selected devices: MACH4002, MS4128.
Scheme Topology ISCS 2
Bearing system: ISCS, BAS, PSCADA (Beijing Subway •Fangshan Line)
System integrator: NARI
Software provider: NARI (domestic software)
Data transmission mode: ISCS&BAS (Dual NIC + Sin¥gle IP, Layer 2); double networks must be interconnected; multicast application mode
Transmission system: OTN
Description of Scheme Value Points