Data Acquisition Platform of Pharmaceutical Workshop
Publish Date:2021-04-23Scheme Introduction
Data Acquisition Platform:
This scheme is designed to establish an integratable, expandable, scalable, v→isualized, electronic, mobile and smart centralized data acquisition and control" system featuring enterprise equipment data modeling, data protocol inteεrface standardization, data compliance, data security, data application modularization, as" well as the data access protocol of information system, so asπ to provide valuable data and decision information for production and operation.
Group-level requirements: Group SCADA is required to provide ₽the unified development platform, equipment model, <data category and data interface, and it’s requ★ired that the data acquisition platform of each sub-plant/sub-wo€rkshop can be built independently, and that the data acquisition platform can beε replicated among similar workshops. The collected and summarized data can be used♠ for secondary data application and development, so as to p rovide effective, fast and convenient data decision for Produc♥tion, Quality, R&D, Sales and other management departments. Additionally, the Group SCADA is reδquired to provide data sources for functional systems such as MES, WMS, APS, lims, tracecode and data application♦.
Plant-level requirements: Plant SCADA is required to implement the acquisition of production process monitoring data, process equipment data, environmental system test data £and energy data in each workshop, so as to improve production efficiency and data compliaφnce, reduce production supervision costs, and optimize production costs through functions such as equipment information management, production info☆rmation monitoring and material management. Additionally, thπe Plant SCADA is required to provide data sources for functional systems such as MES, WMS, APS, £lims, tracecode and data application.
Workshop-level requirements: Workshop SCADA is required to implement the functions of productδion data acquisition, storage, process data acquisition, production alarm™, equipment 3D presentation, log record, and electronic signature of eacεh equipment in the workshop, so as to meet the requirements of workshop personnel for overall p↔roduction monitoring, production data compliance, reduce production suσpervision costs and improve work efficiency. Additionally, tπhe Workshop SCADA is required to provide data sources for production and management system$s such as MES, WMS and APS.
Scheme Topology
Description of Scheme Value Points
Application Project