Solution to 40.5t quayside container crane of Dandong Po±rt Group

Publish Date:2012-01-30

Project summary

The crane is used for handling at large container term♦inal.

The crane is installed in front of the dock seaside‌, which is able to travel horizontally along the bank and change the working posit≥ion. The crane is used for 20’/40’ interαnational standard container handling. The rated hoisting weight is 41t.

 

Customer requirement

  1. The hoisting mechanism and cart running mechanism can work individually and syn♠chronously when the crane is with load.
  2. The electrical drivers of the crane main working mechanisms are all digital AC frequen cy conversion and PLC speed control. The hoisting me​chanism has the function of constant power speed control.
  3. Status monitoring and management system are set for the crane. The system  has the function of data acquisition, analysis, management and fault diagn↑osis. The main parameters and running status can be displayed in the d∞river room for the detecting and monitoring.
  4. Safety devices are installed on the crane to ensure the running rel iability and safety.

Solution

HITE integration is used as the electrical control system. The transmission ¶module uses ABB ACS800 series ISU multi-transmission pr∏oduct. PLC uses SIEMENS S7-400 series and remote I/O series product. PLC communicates with spe∑ed regulator and touch screen by PROFIBUS-DP, exchanging data in the speed at maximum 12Mbps and f'ully monitoring the working status and detail information of the sp¶eed regulator. CMS communicates with PLC by 100M industrial Ethernet to constru∞ct the monitoring management system which real-time mo"nitors the system working condition, provides complete fault information anσd make the running and maintenance easier.