HOME
ABOUT HITE
Introduction
Our Mission
Competitive Advantages
Qualifications & Honors
PRODUCTS
Energy Storage Products
Wind Power Products
CASES
Energy Storage Project
Wind Power Project
NEWS
CONTACT US
中文(wén)
English
News
Pay tribute to the most beautiful workers, and win people through the sea of talents
On May 1st Labor Day, Haide New Energy launched a selection activity with® the theme of "Looking for the Most Beautiful Workers" ☆in order to thank every hard-working worker who is dedicated to his work. Let us pay tribut™e to the following workers with the highest respect, thank t↓hem for their silent contributions, and compose a glorious and brilliant chapter for the company÷.
04
2022
/
08
Hot Spots | [Research] Overview of the market situation of 2 MW units with different rotor∞ diameters
As of the end of 2015, the Chinese wind power market had a total of 20,064 unit≠s with a single unit capacity of 2 MW, with a total installed capacity of 40,120 φMW. Unlike 1.5 MW models, 2 MW models have more specifi₹cations for wind rotor diameters, and market demand is more decentralized. For exampΩle, the wind rotor diameter of 2 MW units covers a range fεrom 72 meters to 122 meters, with a total of 34 specifiδcations, while the wind rotor diameter specifications of 1£.5 MW units are 16, less than half of the 2 MW models.≈ For another example, the wind rotor diameter specifications with the largest installe₹d capacity of 2 MW units are 93 meters, 105 meters, and 111 meters, accounting for a¶bout 31% of all 2 MW models. The wind rotor diameters of the three largest specification s of 1.5 MW units account for more than 76%, and the market ¥concentration of product specifications is obviously h™igher than that of 2 MW.
2016
11
Hot Topics | The "Thirteenth Five-Year Plan" for power development was released today
On November 7, the National Development and Reform Commission and the National Energy Administrat↕ion officially released the "13th Five-Year Plan for Power Development", which is the action program for my country's "13th Five-Yea↑r Plan" power development, a guiding document☆ for the preparation of relevant special plans, and an import♥ant basis for the layout of major power projects. Liang Changxin, spokesman of the National Energ×y Administration and director of the Legal Reform Department, presided over •the meeting, and Han Shui, chief engineer of the National Energy₩ Administration, and Huang Xuenong, director of the Power Department, attended and introduced✘ and interpreted the power plan to everyone.
07