Solutions

Solutions

Gantry crane

Publish Date:2012-03-29

Main kinematic mechanism of gantry crane for ship building

  • upper cart hoisting ½ mechanism
  • lower cart main/slave hoisting mechanism
  • running mechanism for upper/lower cart
  • rigid leg running mechanism of carrier, flexible leg running mechanism of carrier

key technique of gantry crane for ship building

  1. Multiple main hooks can combinational synchronous as spe™ed/position synchronizing, auto trace, auto synchronizing, auto rectification
  2. Dual cart auto synchronizing control and soft limiting control
  3. The precision of auto synchronizing achieves millimete​r level
  4. Encoder auto correction
  5. Multiple main hooks auto flux-weakening according to t he load
  6. Carrier auto rectification, accurate speed synchronizing output, encoder accurate co€rrection at multi-sections

Optimized error correction algorithm, PI control, soft rectifi×cation and low speed auto rectification